didn't they literally just rebuild the tracks out of jamaica on the atlantic branch?

aug 23, 2025, 8:48 pm • 0 0

Replies

avatar
City Nolan @ndhapple.bsky.social

Yes, now dedicated track to a dedicated platform, and it got slower somehow

aug 23, 2025, 8:49 pm • 4 0 • view
avatar
Ian @ianofmanycolours.bsky.social

an andrew cuomo special

aug 23, 2025, 8:49 pm • 2 0 • view
avatar
City Nolan @ndhapple.bsky.social

The doubly silly part is the approaches through Hay and Hall from the South Shore to Jamaica and Jamaica to Atlantic were already grade separated from the Main Line. LIRR has never consistently operated it that way… and so the shuttle was born to “simplify” the operation. Whole thing is a headbanger

aug 23, 2025, 8:54 pm • 4 1 • view
avatar
City Nolan @ndhapple.bsky.social

Also leads to really silly stuff like this happening despite having Tracks 4, 5, 6, 7 and 8 available for eastbound service basically 24/7 — bsky.app/profile/thel...

aug 23, 2025, 8:58 pm • 4 0 • view
avatar
The LIRR Today @thelirrtoday.com

The South Shore requires a merge with the Main Line, which is why they are building the HALL Interlocking bridge now. There were definitely better ways to solve these problems: 1drv.ms/b/c/566715f8... & 1drv.ms/b/c/566715f8...

aug 23, 2025, 9:04 pm • 1 0 • view
avatar
City Nolan @ndhapple.bsky.social

I’m thinking about the Atlantic to Atlantic grade sep, which I guess is usually just the Far Rock and maybe the Long Beach…

aug 23, 2025, 9:11 pm • 0 0 • view
avatar
City Nolan @ndhapple.bsky.social

The progression through at Atlantic 1-Jamaica 3&4/Jamaica 6&7-Atlantic 2

this is... jamaica...
aug 23, 2025, 9:19 pm • 4 0 • view
avatar
The LIRR Today @thelirrtoday.com

It's not, though, when they are using 3 tracks on the Main Line during rush hours. That's why they need another overpass (marked tracks C, D on my sketch) over the VWE.

aug 23, 2025, 9:27 pm • 0 0 • view
avatar
City Nolan @ndhapple.bsky.social

Can’t get the files open on the ferry but I’ll look later

aug 23, 2025, 9:52 pm • 0 0 • view
avatar
City Nolan @ndhapple.bsky.social

IMO: Off the track map, one solution to this might be to have the diesels dwell on Track 7 and then send the electrics to 6 and 8, both of which provide a cross-platform transfer opportunity.

aug 23, 2025, 9:23 pm • 0 0 • view
avatar
City Nolan @ndhapple.bsky.social

I think the logic here is electric to diesel transfers are same platform but… there’s 10 electric trains for every diesel, so… You back up the whole eastbound electric service. 🤷‍♂️

aug 23, 2025, 9:10 pm • 0 0 • view