GO electrification isn’t canceled, it’s just messed up for a mix of incompetence, heritage, and trying to save money while wasting money. Electrification will still happen but take far longer than it should and maybe with an attempt at battery trains in the USRC (which will probably not work out).

aug 25, 2025, 11:14 pm • 3 0

Replies

avatar
JackTatt 🇨🇦 @jacktatttran.bsky.social

The public parts are: - Metrolinx, who thinks they’re experts and smarter than the Germans (who they kept changing requirements and expectations on only to blame for being late), wants to rephrase/refine the project to be manageable - The Bush trainshed won’t fit overhead wires without being raised.

aug 25, 2025, 11:17 pm • 3 0 • view
avatar
JackTatt 🇨🇦 @jacktatttran.bsky.social

My hope is that Toronto has an army of transit advocates both in the profession (who eventually will replace the dying old heads) and not, who care deeply about this and spend most of their advocacy on it and a few other things (since we don’t have to fight for survival like in the states).

aug 25, 2025, 11:20 pm • 3 0 • view
avatar
JackTatt 🇨🇦 @jacktatttran.bsky.social

The opposition NDP (who don’t like P3s) and liberals (who first proposed all this) also have a chance to use this as a club to beat Ford in the 2029ish election while concern about Metrolinx management and high costs relative to European/asian comparators is coming up among laypeople on both sides.