avatar
Jason Andrade @jasonandrade.bsky.social

I don’t exactly know what this means. Yes, they are (for large commercial facilities) in the ones I’ve seen but the utility still builds and owns the infrastructure that steps the voltage down from HV to LV (33/11kV). Even when this is “embedded” into the DC structure. If you have examples?

aug 23, 2025, 11:03 pm • 1 0

Replies

No replies